Friday, June 11, 2010

How Much Is My Charizard Card

bar visible


On the stairs to the upper floor there is this bar. The resting (sawed off) floor boards can be readily seen that the stairs were not accessible at this site, but was eventually installed first.
The bar has been completely plastered, I found this today exposed and cleaned with a wire brush roughly. This goes with a soft brass brush very well.


On the other side of the stairs, I removed the loose plaster, I noticed the opposite really. The stand can be seen here are also much more recent such as bars. The wall was eventually built over time. All the wood in the wall has been re-used.


The bar side is strongly blackened and covered with a thick layer of soot. When the brush smelled "burnt". As we have elsewhere in the house is the presumption that it has eventually burned in the house.



Under the stairs I have recovered the old floor boards. These are the opinion of the building researchers about 200 years old. The material I can not determine, any soft stone. The color is reddish and greenish. The square brick, about 20 * 20 cm, were also laid in the floor and are unusual in northern Germany.
Both stones I want to keep.


Thursday, June 10, 2010

Oversized Beanie Hat To Knit Pattern

with further Trivia

Once again, I ordered a container. In recent weeks, has a bit rubbish accumulated in the house and disabled now. This is something I've done today taken a day leave, then work through to 3 days.
equal early then once frustration to park a rarely stupid pliers have his penis extension in such dam *** that I can now each time rumtanzen him. As a little revenge I then tried to make nice lot of dirt ...



Although no high water is still water in the basement. It will probably be due to the abundant rainfall in recent weeks. How do we get the problem under control I do not know. Well no matter, only to get away with it.


have half the day I spent bringing with debris from the house. Further, I have found in this area but now expanded the existing parquet. I wanted to first in it, according to recent plans now but here comes out the bathroom.


Well, and in some places, I then something rumgehackt haphazardly, in this example. old lines drawn.


Sunday, May 23, 2010

Cleaning Brake Dust Mag



Hello construction worker inside

,




First stage managed - purchase agreement is signed


    This morning (07/05/2010) at 8:00 in the clock Early, was officially signed the contract. Ensure that the project is nearing realization!
  • can now begin the renovation - the first date for this is
  • Saturday, 15 May, at 11 clock
  • . There it will be in the new house is a short project presentation, and then the official start of construction with the clearing out
  • start.
  • On 15 May is starting to clear out the house, that is, all the old carpets ripped out and discarded. Existing Schutter is eliminated and it is disposed of unneeded furniture.
general, it is about that house for the after work ahead to clear out completely and make all possible preparations to ensure that construction companies and we can then begin with the larger works.
bring: Please bring work clothes. Dining is provided by us free of charge. If anyone has the tools that can be used in the EntrĂ¼melung - please bring.
All other appointments, and other events here in this blog ..
Thank you - ISZ team



var data, p;
var carries navigator.userAgent.toLowerCase = (); p = 'http'; if ((location.href.substr (0,6) == 'https :') {Data = data + '& sd =' + screen.colorDepth + '& sw =' + escape (screen.width + 'x' + screen.height)};
document.write ('
'); document.write ('
');
free counter